Survey and Installation Process PV

Survey and installation
All our surveys are free of charge and non-binding. Our surveyor will examine all aspects of the Solar PV installation like roof conditions, weight load, mounting system, cable runs, inverter positioning and grid connection. He will then discuss all the relevant points with the house owner and talk through the various options of the installation plan.
Within a week Suntrader will send you;

  • Quotation
  • Sap Calculation (performance forecast or estimation)
  • Roof Plan
  • Solar Panel Specification Sheet

A domestic installation takes normally 2 to 3 days. Most of the installation time is spent on roof work and will therefore not disrupt your day to day domestic life. Indoor work such as the installation of the inverter, generation meter and the grid-connection takes under normal circumstances only  2 to 4 hours.  After Suntrader has completed the installation work we will commission the system. Once completed we will then undertake the handover where Suntrader will explain the functioning of the system and provide all the documents necessary for your feed-in tariff.

Comments are closed.